Kennedy Space Center Partnerships

Developing Partnerships... Launching Dreams

Skip Navigation

Launch Equipment Test Facility

Launch Equipment Test Facility

Kennedy Space Center (KSC) is home to the Launch Equipment Test Facility (LETF), a versatile test and development area that supports the entire spectrum of operational programs.  The LETF was originally established in the 1970s to accommodate full-scale qualification of Space Shuttle umbilicals and T-0 release mechanisms.  It has been upgraded and refurbished to support NASA’s Space Launch System (SLS) program, and is used to test a wide variety of large-scale hardware and ground support equipment components.  Equipment at the facility can recreate lift-off and operational conditions to test component performance, and can supply cryogenics, hydraulics, electrical, ECS and other commodities to enable “Test-as-you-fly”.

Capabilities

The LETF’s unique facilities/services include:

  • 600-ton test fixture for multipurpose proof loading of large testing articles in either the vertical or horizontal orientation, and in either tension or compression
  • Two independent Vehicle Motion Simulators recreate all of the motions that a launch vehicle (6 Degrees of Freedoms) will experience from rollout to the launch pad through the first second of launch
  • Qualification testing of umbilical systems in both pre-launch and launch environments and launch vehicle access arms in pre-launch environment
  • Verification of operational procedures, clearances, disconnect systems performance and margins, and vehicle loads throughout the vehicle processing flow
  • Ability to create LN2 and LH2 flows to subject test articles to cryogenic temperatures and pressure
  • Ability to perform component testing using LN2, LH2, GN2, GHE, water or hydraulic fluid
  • Vehicle Stabilizer Test Fixture -- motion control system capable of simulating large biaxial load profiles
  • Data Monitoring and Acquisition – Data acquisition system/software and video system available in fully equipped control room with test team communication system
  • Mobile Instrumentation Support – mobile, self-contained control room with National Instruments PXI-based Data Acquisition System, operates off facility or generator power

Accomplishments

  • Began qualification testing of newly designed and fabricated SLS mobile launcher umbilicals in March 2015 (Aft Skirt Electrical Umbilical program is complete)
  • Provided instrumentation support for the SLS Mobile Launcher during its move to Pad B
  • Provided support for Orion Launch Abort System Pyro Shock Testing.
  • Provided support to Lockheed Martin Targeting Missile Systems Division

 

Ready to Launch?

Ready to explore a partnership, or simply need more information?  Please submit your inquiry to our KSC Facilitator.

Submit Request »